hero
Designed and Developed Work Packages

USNS Bob Hope Class-Integrated Bridge System Upgrade

Client
United States Coast Guard
Overview

The GBS Group was contracted to design and develop a United States Coast Guard and ABS-approved T-ALT package for the USNS Bob Hope Class Integrated Bridge System Upgrade. The work packages were required for the execution of several modifications onboard the T-AKR 300 BOB HOPE Class including the ECDIS, Radar Upgrade, Gyro As-Builts, Magnetic Compass Upgrade, Steering Stand Upgrade, and Rudder Angle Indicator Upgrade. Each TRANSALT work package GBS created consisted of a work item, contract guidance drawings, consolidated list of materials, production estimate, and weight report.